ALTERNATIF PERENCANAAN JETTY DI MUARA TUKAD PANGI KABUPATEN BADUNG
Abstrak
Pererenan Beach experiences annual shoreline changes, with an average change of coastline of 15.07 m and an average erosion rate of 2.15 m / year for 10 years and sediment accumulation along the mouth of the Tukad Pangi estuary. Looking at the current conditions, it is necessary to plan buildings that are able to overcome sediment problems and change the flow that occurs. In this plan, jetty type building was chosen using geobag material, geobags were chosen to save construction costs because they could use sand material on site. The planning results show the height of the jetty building is 2.60 m with the width of the jetty building 1 m. The budget plan for planning the jetty in the Tukad Pangi estuary is Rp. 2,543,918,000 and the duration of the work is 122 days.
Authors who publish with this journal agree to the following terms:
- Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution License that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this journal.
- Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this journal.
- Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) prior to and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published work (See The Effect of Open Access).