IDENTIFIKASI FAKTOR-FAKTOR RISIKO PADA PROYEK INFRASTRUKTUR DASAR DAN FASILITAS UMUM PENUNJANG PARIWISATA DI PELABUHAN BENOA, BALI
Abstract
In general, risks in construction projects can affect project objectives, namely affecting costs, quality and time. In a construction project, a risk factor is a possibility that causes a loss. This study was conducted to determine the dominant risk factors and risk mitigation that caused delays in the implementation of the basic infrastructure and tourism support public facilities project at Benoa Harbor. In this study, data was collected through a questionnaire which was then checked for validity, correlation and reliability using SPSS. Furthermore, to determine the dominant risk, the Severity Index method is used. Based on this research, there are 20 risk factors that cause project delays. The dominant risks based on the level of risk are unexpected events (natural disasters, fires) of 12%, changes in work that has been completed by 10%, environmental changes including changes in weather or climate. at project sites by 10%, repairs that are not in accordance with specifications by 8%, and limited authority of personnel/owners in making decisions by 8%. The dominant risks identified in the project really need to find solutions because they have a very significant impact on project performance.
References
Ariyanto, A. S., Kamila, K. A. P., Supriyadi, S., Utomo, M. B., & Mahmudi, W. L. (2019). Pengaruh Keterlambatan Material Terhadap Risiko Proyek Pembangunan Gedung Parkir. Bangun Rekaprima: Majalah Ilmiah Pengembangan Rekayasa, Sosial dan Humaniora, 5(2), 51-58.
Gunawan, J., & Surono, W. (2015). Identifikasi Dan Alokasi Risiko-risiko Pada Proyek Superblok Di Surabaya. Jurnal Dimensi Pratama Teknik Sipil, 4(2).
Leondro, W. (2017). Analisa Faktor Risiko Terhadap Biaya dan Waktu Pelaksanaan dengan Metode Severity Index (Studi Kasus Proyek Mall TOP 100 Penuin-Batam, Doctoral dissertation, Universitas Internasional Batam.
Maliki, I. N. (2016). Evaluasi Faktor-Faktor Dominan Risiko Teknis Pelaksanaan Proyek Jember Icon Tahap Dua Dengan Metode Severity Index. Tugas Akhir, Jurusan Teknik Sipil, Fakultas Teknik, Universitas Jember.
Management, S. (16 August 2022). Rumus Slovin: Pengertian, Notasi, Dan Contoh Soal. Citing Internet source URL https://www.sampoernaacademy.sch.id/id/rumus-slovin/
Marris, S., & Pratiwi, R. (2017). Analisis Penerapan Konsultan Manajemen Konstruksi pada Tahap Lanjutan Gedung Rumah Sakit Pendidikan 8 Lantai Universitas Tanjungpura. JeLAST: Jurnal PWK, Laut, Sipil, Tambang, 4(4).
Mulyarko, L. G., Hartono, W., & Sugiyarto, S. (2015). Analisa Pengaruh Risiko Pada Kontrak Kerja Konstruksi Terhadap Biaya Pekerjaan (Studi Kasus: Proyek Pembangunan Jalan Tol Bogor Ring Road Seksi II a). Matriks Teknik Sipil, 3(2).
Prasetyo, A., Setyaning, L. B., & Riyanto, E. (2023). Literature Review: Analisis Manajemen Risiko Pada Proyek. Renovasi : Rekayasa Dan Inovasi Teknik Sipil, 8(1). https://doi.org/10.30738/renovasi.v8i1.14425
Rani, H. A. (2016). Manajemen Proyek Konstruksi. Yogyakarta: Deepublish Publisher.
Rani, N. M. S., & Yuni, N. K. S. E. (2021). Analisis Faktor Risiko Terhadap Keterlambatan Proyek Konstruksi the Himana Condotel. Paduraksa: Jurnal Teknik Sipil Universitas Warmadewa, 10(1), 41-55.
Santoso, K. J., Wijaya, K. A., & Chandra, H. P. (2021). Potret industri konstruksi di Surabaya dalam masa pandemi COVID-19. Jurnal Dimensi Pratama Teknik Sipil, 10(1), 57-64.
Saputro, C. D. (2022). Analisis Manajemen Risiko Proyek Bangunan Gedung Bertingkat Dengan Metode Severity Index. Journal of Civil Engineering Building and Transportation, 6(2), 140-147.
Sitanggang, N., Simarmata, J., & Luthan, P. L. A. (2019). Pengantar Konsep Manajemen Proyek Teknik (T. Limbong (ed.); Issue August. Yayasan Kita Menulis.
Soetopo, A. A., Willar, D., & Manoppo, F. J. (2017). Pemodelan Pengelolaan Risiko Proyek Pembangunan Jaringan Irigasi Sangkub Kiri Kabupaten Bolaang Mongondow Utara. Jurnal Ilmiah Media Engineering, 7(3).
Susila, H., & Handoyo, S. (2016). Analisis Faktor Dominan Resiko Biaya Pada Pelaksanaan Proyek Konstruksi Gedung di Surakarta. Jurnal Teknik Sipil dan Arsitektur, 18(22).
Authors who publish with this journal agree to the following terms:
1. Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution-ShareAlike 4.0 International (CC BY-SA 4.0) that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this journal.
2. Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this journal.
3. Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) prior to and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published work (See The Effect of Open Access).