METODE PELAKSANAAN KONSTRUKSI REVETMENT

  • Wayan Jawat

Abstract

ABSTRACT Construction method is the key to be able to realize the entire planning into a physical building form. Basically the construction method is the application of the concept of engineering based on the relationship between the requirements in the tender documents (procurement documents), technical and economic conditions that exist in the field, and all resources including the experience of contractors. The role of the method of carrying out a construction project work is to construct ways of working in the performance of a job and a means of fulfilling, determining the means of employment that support the implementation of a work such as establishing, selecting the equipment to be used in the work appropriate to the type of work effective and efficient in operating costs. How it works can also help in determining the sequence of work, arrange the schedule so that it can determine the completion of a job. Coastal areas are highly intensive areas for human activities such as: government centers, settlements, industries, ports, fishponds, buffers and tourism. The island of Bali is a major international tourist destination so keeping the beach in good condition is a must. This has made the development of natural land function especially in coastal and coastal areas as the buffer of ecological cycle (Public Works Agency of Bali Province, 2014). The main material in making this revetment is andesite stone consisting of andesite stone weighing 475-525kg, 100 kg, and 10-40 kg, as for the workmanship using the help of heavy equipment in the form of excavators to move construction materials. Keyword: method, construction, revetment, coastal

References

Abrar Husen. (2010). Manajemen Proyek.

Yogyakarta. Andi Offset.

Alloysius Vendhi Prasmoro. (2014).

Jurnal OE. Volume VI. Jurusan Teknik

Industri. Universitas Mercu Buana.

Badan Pembinaan Konstruksi Kementrian

PU. (2014). Kontrak Lump Sum

Pekerjaan Jasa Konstruksi. Jakarta:

Bidang Administrasi Kontrak Pusat

Pembinaan Penyelenggaraan

Konstruksi.

Balai Wilayah Sungai Bali-Penida. (2011).

Pengamanan Pantai. Denpasar.

Dinas Pekerjaan Umum Provinsi Bali.

(2014). Perencanaan Pengaman Pantai

di Kabupaten Buleleng. Denpasar.

Dipohusodo, I. (1996). Manajemen Proyek

dan Konstruksi Jilid 1 & 2.

Yogyakarta. Penerbit Kanisius.

Ervianto, W. I. (2004). Teori-Aplikasi

Manajemen Proyek Konstruksi.

Yogyakarta: Penerbit ANDI.

Ervianto, W. I. (2005). Manajemen Proyek

Konstruksi. Yogyakarta: Penerbit

ANDI.

Ervianto, W. I. (2012). Selamatkan Bumi

Melalui Konstruksi Hijau,

Perencanaan, Pengadaan, Konstruksi

dan Operasi. Yogyakarta: Penerbit

ANDI.

Imam Soeharto, I. (1995). Manajemen

Proyek Konstruksi Dari Konseptual

sampai Operasional. Jakarta: Penerbit

Erlangga Jakarta.

Jawat, I Wayan. (2014). Penerapan Metode

Green Construction (Studi Kasus:

Pekerjaan Tanah pada Proyek Jalan).

Jurnal Paduraksa Volume 3, Nomor 2,

Desember 2014.

Jawat, I Wayan. (2015). Metode

Pelaksanaan Pekerjaan Pondasi (Studi

Kasus: Proyek Fave Hotel Kartika

Plaza). Jurnal Paduraksa Volume 4,

Nomor 2, Desember 2015.

Jawat, I Wayan. (2016). Metode

Pelaksanaan Pekerjaan Tiang Pancang

Sistem Hidraulic Jack in (Studi Kasus:

Proyek KCU BCA Sunset Road Bali).

Jurnal Paduraksa Volume 5, Nomor 2,

Desember 2016.

Mahendra Sultan Syah. (2004),

Manajemen Proyek Kiat Sukses177

Mengelola Proyek. Cetakan Pertama.

Gramedia Pustaka Utama. Jakarta.

Prodjosumarto, P. (1993). Pemindahan

Tanah Mekanis. Jurusan Teknik

Pertambangan. Institut Teknologi

Bandung.

Published
2018-02-12
Section
Articles
Abstract viewed = 2586 times
PDF (Bahasa Indonesia) downloaded = 15330 times