PERENCANAAN KEBUTUHAN DAN PENJADWALAN BIAYA SUMBER DAYA PADA PELAKSANAAN PROYEK KONSTRUKSI
Abstract
ABSTRACT The proposed bid price should be an estimate of real cost or direct cost plus indirect cost plus profit. As is known one of the parameters that affect the value of direct costs is labor costs. In the field of labor unit prices often fluctuate, so it will affect in determining labor costs. The final outcome of this plan will be used as a basis in the labor cost control during the implementation of the project. Based on the discussion, the total cost of human resources is IDR 328.369.050,00, of labor cost IDR 183.750.000,00, foreman fee IDR 25.107.550,00, the cost of weaving IDR 47.880.000,00, the cost of a smith IDR 9,000,000.00, the cost of masonry IDR 41.350.000,00, carpentry costs IDR 1.750.000,00, smith cost IDR 183.512.000,00, the cost of masonry IDR 189.000,00, carpentry fee IDR 1.900.500,00. Keyword: planning, labor costs, construction projectsReferences
DAFTAR PUSTAKA
Ars Group. (1982). Rencana Anggaran &
Borongan Bangunan. Cetakan
Keenam. Ars Group: Bandung.
Ars Group. (1982). Pengetahuan
Anggaran & Borongan Bangunan.
Cetakan Keenam, Ars Group:
Bandung.
Asiyanto. (2002). Construction Project
Cost Management. Cetakan Pertama.
PT. Pradnya Paramita: Jakarta.
Soeharto, I. (1995). Manajemen Proyek
Dari Konseptual Sampai Operasional.
Cetakan Pertama. PT. Gelora Aksara
Pratama: Jakarta.
Dipohusodo, I. (1995). Manajemen Proyek
Dan Konstruksi Jilid 1. Cetakan
Pertama. PT. Kanisius: Yogyakarta.
Dipohusodo, I. (1996). Manajemen Proyek
Dan Konstruksi Jilid 2. Cetakan
Pertama. PT. Kanisius: Yogyakarta.12
PADURAKSA, Volume 6 Nomor 1, Juni 2017 P-ISSN: 2303-2693
E-ISSN: 2581-2939
Mukomoko, J.A. (1989). Dasar
Penyusunan Anggaran Biaya
Bangunan. Cetakan Kesembilan. Gaya
Media Pratama: Jakarta.
Mahendra Sultan Syah. (2004).
Manajemen Proyek Kiat Sukses
Mengelola Proyek. Cetakan Pertama,
PT. Gramedia Pustaka Utama: Jakarta.
Sutjipto, R. (1985). Manajemen Proyek
Konstruksi Jilid 1. Cetakan Pertama,
Kartika Yudha: Surabaya.
Sutjipto, R. (1986). Manajemen Proyek
Konstruksi Jilid 2. Cetakan Pertama,
Kartika Yudha: Surabaya.
Soekarno Malangjoedo. (1978). Syaratsyarat Umum untuk Pelaksanaan
Bangunan Umum yang Dilelangkan.
Departemen Pekerjaan Umum: Jakarta.
Soedrajat, A. (1984). Analisa Anggaran
Biaya Pelaksanaan. NOVA: Bandung.
Sutjipto, R & Paul Nugroho & Ishak
Natan. (1985). Manajemen Proyek
Konstruksi. Kartika Yudha: Jakarta.
Wulfram, I. E. (2002). Manajemen Proyek
Kontruksi. Andi Offset: Yogyakarta
Authors who publish with this journal agree to the following terms:
- Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution License that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this journal.
- Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this journal.
- Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) prior to and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published work (See The Effect of Open Access).