KAJIAN METODA PELAKSANAAN PEKERJAAN PONDASI BORED PILE PADA TAHAP PERENCANAAN PELAKSANAAN
Abstract
Bored pile foundation is a pile foundation whose installation is done by drilling the soil first. This type of bored pile foundation is widely used in construction projects. The selected bore pile foundation is adjusted to the type of soil, terrain conditions, and the selected construction method. The construction method is the elaboration of procedures and works implementation techniques which are the core of all activities in the construction management system. For this reason, it is interesting to study the method of implementing the bore pile foundation at the planning stage of the implementation of the GOR Development project in Abiansemal, Badung. The implementation planning stage is an important activity in order to provide a more detailed picture of strategies and techniques for working efficiently and effectively in terms of time, quality and cost. The goal to be achieved in this research is to study the method of implementing the foundation at the planning stage of implementation. So that it can contribute to the development of knowledge about the application of the theory of the method of implementing the bore pile foundation and is information for those who are interested in further research. Based on the results of the study that the preparatory work begins with the determination of the pile center point and placement of bored pile devices. In drilling work using the wet drilling method volume 1105.00 m with a duration of 8 days. For the work of reinforcing the volume of 9309.61 kg and the duration of 13 days was preceded by the fabrication process and continued with the installation of reinforcement into the borehole. Casting is done using a pipe, volume 74.394 m³ with a duration of 11 days. Next, determine the pile cap and excavation work, followed by pile cap floor work with concrete fillings, volume 136.708 m³ for 6 days. As formwork using concrete blocks with a volume of 237.474 m² worked on for 14 days, followed by the formation of reinforcement and assembly of volume 5454.21 kg with a duration of 9 days and casting methods carried out manually with a volume of 117.632 m³ and a duration of 14 days.
References
Anonim. (2018). Penyusunan DED Pembangunan GOR Tenis Meja di Kecamatan Abiansemal. Mangupura.
Asiyanto. (2010). Manajemen Produksi untuk Jasa Konstruksi. Jakarta: PT. Pradnya Paramita.
Dhiva, I. G. N. A. (2014). Analisis Produktivitas Pengeboran Pondasi Bor Pile Dengan Menggunakan Mesin Bor Ringan. Jurnal Rekayasa Sipil, 8(2), 128–135.
Dipohusodo, I. (1996). Manajemen Proyek dan Konstruksi (Jilid 1 &). Yogyakarta: Kanisius.
Ervianto, W. I. (2005). Manajemen Proyek Konstruksi. Yogyakarta: Andi Offset.
Fadilah, U. N., & Tunafiah, H. (2018). Analisa Daya Dukung Pondasi Bored Pile Berdasarkan Data N-SPT Menurut Rumus Reese&Wright Dan Penurunan. Jurnal IKRA-ITH Teknologi, 2(3), 7–13.
Hardiyatmo, H. C. (2011). Analisis dan Perencanaan Fondasi I (Edisi 2). Yogyakarta: Gadjah Mada University Press.
Jawat, I. W., Rahadiani, A. A. D., & Armaeni, N. K. (2018). Produktivitas Truck Concrete Pump Dan Truck Mixer Pada Pekerjaan Pengecoran. PADURAKSA, 7(2), 164–183.
Livia, & Suhendra, A. (2018). Studi kapasitas tiang bor berdasarkan metode pile driving analyzer (PDA) dan load cell. JMTS: Jurnal Mitra Teknik Sipil, 1(1), 82. https://doi.org/10.24912/jmts.v1i1.2245
Mubarak, Bulba, A. T., & Yunita, M. (2014). Studi nilai produktivitas pekerjaan pondasi bored pile. Jurnal Teknik Sipil Universitas Syiah Kuala, 3(2), 199–208. Retrieved from http://jurnal.unsyiah.ac.id/JTS/article/view/5584/4615
Syah, M. S. (2004). Manajemen Proyek Kiat Sukses Mengelola Proyek. Jakarta: Gramedia Pustaka Utama.
W.Lar, C. F. (2006). Project Management: The Managerial Process 3th Edition. The McGraw – Hill Companies, Inc.
Authors who publish with this journal agree to the following terms:
- Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution License that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this journal.
- Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this journal.
- Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) prior to and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published work (See The Effect of Open Access).