EVALUASI KINERJA PROYEK PEMBANGUNAN GEDUNG AKIBAT PERUBAHAN DOKUMEN KONTRAK DENGAN METODE EARNED VALUE
Abstract
ABSTRACT The main objectives in the construction project are completed with the appropriate cost, time, quality according to specifications, and the fulfillment of work safety. However, the construction project have a problem. In this study, the project problem that occurs is a change in contract documents. The research was carried out through interviews and brainstorming with parties involved and competent in their fields. From the results of interviews and brainstorming, it was found that the changes that occurred were changes in structure design, addition of work items, reduction of work items, and changes in finishing materials. The cause of this change is the difference in architectural structure and function images by the planning consultant, the owner and consultant planner's desire to add /reduce work items, the desire of the owner and consultant planner to change the finishing material used. The impact of these changes is in the Compensable Delay category. Earned Value analysis is carried out at the end of the work, with the result that the project has an extension of 3 months and there is an addendum of additional work of 6.14% of the contract value. This condition needs attention for the owner and consultant planner to finalize the design/image before the tender process is carried out to reduce the risk of additional project time and costs. Keywords: contract documents, project performance, earned values ABSTRAK Tujuan utama dalam proyek konstruksi adalah terselesaikannya proyek sesuai dengan biaya yang dianggarkan, waktu yang direncanakan, mutu yang sesuai dengan spesifikasi, dan terpenuhinya keselamatan kerja. Namun kenyataannya, proyek konstruksi pasti memiliki kendala-kendala yang menyebabkan terjadinya permasalahan proyek. Pada penelitian ini, permasalahan proyek yang terjadi adalah akibat adanya perubahan dokumen kontrak. Penelitian dilakukan dengan wawancara dan brainstorming dengan pihak yang terlibat dan berkompeten dibidangnya. Dari hasil wawancara dan brainstorming, diperoleh identifikasi perubahan-perubahan yang terjadi yaitu perubahan desain struktur, penambahan item pekerjaan, pengurangan item pekerjaan, dan perubahan material finishing. Penyebab terjadinya perubahan ini adanya perbedaan gambar struktur dan fungsi arsitektur oleh konsultan perencana, keinginan owner dan konsultan perencana untuk menambah/ mengurangi item pekerjaan, keinginan owner dan konsultan perencana untuk merubah finishing material yang digunakan. Dampak dari perubahan-perubahan tersebut masuk dalam kategori Compensable Delay. Analisis Earned Value dilakukan pada akhir pekerjaan, dengan hasil bahwa proyek mengalami perpanjangan waktu 3 bulan dan terjadi addendum penambahan pekerjaan sebesar 6.14% dari nilai kontrak. Kondisi ini perlu mendapat perhatian bagi owner dan konsultan perencana agar mematangkan desain/ gambar sebelum dilakukan proses tender untuk mengurangi risiko penambahan waktu dan biaya proyek. Kata kunci: dokumen kontrak, kinerja proyek, earned valueReferences
Asiyanto. (2005). Manajemen Produksi untuk Jasa Konstruksi. Jakarta: Pradnya paramitha.
Ervianto, W.I. (2004). Teori-Aplikasi Manajemen Proyek Konstruksi. Edisi I. Yogyakarta: CV Andi Offset.
Kartikasari, D. (2014). Pengendalian Biaya dan Waktu dengan Metode Earned Value (Study Kasus: Proyek Struktur dan Arsitektur Production Hall-02 Pandaan. EXTRAPOLASI Jurnal Teknik Sipil Untag Surabaya, 7(2),107-114.
PT.PP. (2003). Buku Referensi untuk Kontraktor Bangunan Gedung dan Sipil. Jakarta: PT.Gramedia Pustaka Utama.
Nurhayati. (2010). Manajemen Proyek. Yogyakarta: Graha Ilmu.
Soeharto, I. (1995). Manajemen Proyek Dari Konseptual Sampai Operasional. Jakarta: Erlangga.
Soeharto, I. (1999). Manajemen Proyek (Dari Konseptual sampai Operasional) Edisi 2. Jakarta: Erlangga.
Suherman, S.A. (2010). Tips Jitu Menang Tender Cetakan 1. Yogyakarta: Media Pressindo.
Witjaksana, B., & Reresi, S.P. (2012). Analisis Biaya Proyek dengan Metode Earned Value dalam Proses Kinerja (Studi Kasus Pada Pembangunan Universitas Katholik Widya Mandala Pakuwon Citi-Surabaya). Extrapolasi Jurnal Teknik Sipil Untag Surabaya, 5(2), 45-56.
Authors who publish with this journal agree to the following terms:
1. Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution-ShareAlike 4.0 International (CC BY-SA 4.0) that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this journal.
2. Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this journal.
3. Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) prior to and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published work (See The Effect of Open Access).