Manajemen risiko pada sistem penyediaan air minum (SPAM) perpipaan dengan metode failure mode and effect analysis dan fault tree analysis di Kabupaten Minahasa Utara
DOI:
https://doi.org/10.22225/pd.13.2.10108.138-147Keywords:
FMEA, FTA, SPAM, management, riskAbstract
The construction of a piped Drinking Water Supply System in North Minahasa Regency is very much needed to meet the community's access to drinking water needs. Apart from planning and implementing SPAM construction to achieve quality and sustainable drinking water services, a risk management process is also needed to reduce and anticipate system failures. Through this research, failures and risks in the SPAM development process in North Minahasa Regency can be analyzed using appropriate risk management methods. This is to ensure the sustainability and reliability of SPAM for the communities served. To obtain the data needed in this research, researchers conducted brainstorming, direct observations in the field, interviews with parties involved in SPAM development, and filled out questionnaires. The data obtained is then analyzed using the risk management process, starting from the stages of risk identification, risk assessment, risk management, and implementation of risk management. From the results of the risk assessment using the Failure Mode and Effect Analysis (FMEA) method and the Fault Tree Analysis (FTA) method, 85 risks were identified. In the technical planning for SPAM implementation there are 19 risks, raw water units 28 risks, production units 19 risks, distribution units 12 risks, and service units 7 risks. Each SPAM component is taken for potential risk by calculating the highest RPN value, namely 324.76, for the risk of workers not using K3 equipment. Using the fault tree in the FTA method, we get 13 basic events for the risk of delays in work implementation, 11 basic events for the risk of workers not using K3 equipment, 12 basic events for construction implementation that does not follow implementation methods and plan drawings, 12 basic events for the risk of pipe leaks, and 12 basic events for water use that are not recorded by the water meter. The risk management process for piping SPAM in this research can be a reference framework for implementing further SPAM development.
References
Ahmadi, M., Behzadian, K., Ardeshir, A., & Kapelan, Z. (2016). Comprehensive risk management using fuzzy FMEA and MCDA techniques in highway construction projects. Journal of Civil Engineering and Management, 23(2), 300–310. https://doi.org/10.3846/13923730.2015.1068847
J. Pawar, G., & J.Mukhopadhyay, S. (2015). Application of Design Failure Modes and Effect Analysis (DFMEA) to Vertical Roller Mill Gearbox. International Journal of Engineering Research, 4(12), 663–667. https://doi.org/10.17950/ijer/v4s12/1207
Juan, Y.-K., Sheu, U.-Y., & Chen, K.-S. (2023). Application Of Statistical Data And Methods To Establish RPN Ratings Of FMEA Method For Construction Projects. Journal Of Civil Engineering And Management, 29(7), 662–668. https://doi.org/10.3846/jcem.2023.19942
Karim, I. A. N. S. A., Supit, C. J., & Hendratta, L. A. (2016). Perencanaan Sistem Penyediaan Air Bersih Di Desa Motongkad Utara Kecamatan Nuangan Kabupaten Bolaang Mongondow Timur. Jurnal Sipil Statik, 4(11), 705–714.
Kementerian PUPR. (2018). Peraturan Menteri Pekerjaan Umum dan Perumahan Rakyat Nomor 27/PRT/M/2016 Tahun 2016 Penyelenggaraan Sistem Penyediaan Air Minum.
Kombo Mpindou, G. O. M., Escuder Bueno, I., & Chordà Ramón, E. (2022). Risk analysis methods of water supply systems: comprehensive review from source to tap. Applied Water Science, 12(4), 56. https://doi.org/10.1007/s13201-022-01586-7
Kondoy, R. S. R., Manoppo, F. J., & Rondonuwu, S. G. (2022). Pemodelan Risiko Terhadap Pelaku Pekerjaan Konstruksi Sistem Penyediaan Air Minum (SPAM) Di Kabupaten Minahasa Selatan. Jurnal Ilmiah Media Engineering, 12(1), 99–112.
Pasaribu, H. P. (2017). Metode Failure Mode And Effect Analysis (FMEA) Dan Fault Tree Analysis (FTA) Untuk Mengidentifikasi Potensi Dan Penyebab Kecelakaan Kerja Pada Proyek Gedung [Tesis]. Universitas Atma Jaya Yogyakarta.
Putra, Z., Chan, S., & Iha, M. (2018). Desain Manajemen Risiko Berbasis ISO 31000 Pada Pdam Tirta Meulaboh. Ekombis: Jurnal Fakultas Ekonomi, 3(1). https://doi.org/10.35308/ekombis.v3i1.398
Rumimper, R. R., Sompie, B. F., & Sumajouw, M. D. J. (2015). Analisis Resiko Pada Proyek Konstruksi Perumahan Di Kabupaten Minahasa Utara. Jurnal Ilmiah Media Engineering, 5(2), 381–389.
Sandhyavitri, A., & Young, R. (2015). Risk management in water supply. 30th WEDC International Conference, 629–631.
Septiani, H., Wibowo, M. A., & Syafrudin, S. (2016). Aplikasi Manajemen Risiko pada Pembangunan Sistem Penyediaan Air Minum (SPAM) Regional Jawa Tengah (Studi Kasus pada Pembangunan Jaringan Transmisi SPAM Regional Bregas). Media Komunikasi Teknik Sipil, 21(2), 123. https://doi.org/10.14710/mkts.v21i2.11238
Serpell, A., Ferrada, X., & Rubio, N. L. (2017). Fostering the effective usage of risk management in construction. Journal of Civil Engineering and Management, 23(7), 858–867. https://doi.org/10.3846/13923730.2017.1321578
Tambingon, D. P., Hendratta, L. A., & Sumarauw, J. S. F. (2016). Perencanaan Pengembangan Sistem Distribusi Air Bersih Di Desa Pakuure Tinanian. Jurnal Sipil Statik, 4(9), 541–550.
Turskis, Z., Gajzler, M., & Dziadosz, A. (2012). Reliability, Risk Management, and Contingency of Construction Processes and Projects. Journal of Civil Engineering and Management, 18(2), 290–298. https://doi.org/10.3846/13923730.2012.672931
Downloads
Published
Issue
Section
License
Authors who publish with this journal agree to the following terms:
1. Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution-ShareAlike 4.0 International (CC BY-SA 4.0) that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this journal.
2. Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this journal.
3. Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) prior to and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published work (See The Effect of Open Access).